Sandy Ward  > Libraries > Holyoke Public Library > Construction Site
This album contain my photos (and some videos) of the construction phase of the Holyoke Public Library renovation/expansion project, January 2012- . See also the photo documentation on the Library website: http://www.holyokelibrary.org (That website includes photos submitted by the contractor and building committee members, as well as link to a webcam providing live images of the site).
gallery pages:  1  2  3  4  5  6  >  >>
< 1 of 236 >
The original 1902 building as seen on January 13, 2012, from the parking lot.
January 13, 2012.  Renovation Committee Meeting, chaired by William Fuqua, left, Holyoke Dept of Public Works.  Terry Plum, President of the Board of Directors of the Holyoke Public Library Corporation, right. (María Pagán, Library Director, is barely visible in right foreground.)
January 13, 2012.  Interior of the old library to be renovated.
January 13, 2012.  Asbestos abatement on the 2nd floor (old Technical Services room).  In December there had been a large asbestos abatement project in the basement as the old furnace was dismantled.
Fundraising continues as construction begins.
Note the new position of the fencing.  February 14, 2012.
February 14, 2012.
Some trees along the curbside have been removed.  February 14, 2012.  Chestnut Street will be modified to accommodate some diagonal parking, increasing the parking capacity.
The original 1902 building as seen on January 13, 2012, from the parking lot.
The original 1902 building as seen on January 13, 2012, from the parking lot.
The original 1902 building as seen on January 13, 2012, from the parking lot.
gallery pages:  1  2  3  4  5  6  >  >>
< 1 of 236 >